Check before you sign
PRAT BUILDING
寶力大樓
15 PRAT AVE PRAT BUILDING
2 red flags
Each item below is a statutory order the Buildings Department currently has on this building. The cost falls on the owners.
- Age
- 61yrs
- Storeys
- 8F
- Height
- 24m
- District
- Yau Tsim Mong
Open statutory orders
Mandatory building inspection notice
MBISA statutory notice requiring owners to appoint a Registered Inspector to inspect the building and carry out prescribed repair. Owners pay, apportioned by share — this is where a major-repair bill comes from.
Buildings Department page →Mandatory window inspection notice
MWISA statutory notice requiring the building's windows to be inspected. Smaller than MBIS, but it still has a deadline and the owners still pay.
Buildings Department page →
Legal thresholds already crossed
61 years old — inside the mandatory inspection scheme
Private buildings enter the Mandatory Building Inspection Scheme at 30 years and can be selected at any time. Banks also shorten mortgage tenor on older buildings, which changes what a buyer can borrow.
61 years old — inside the compulsory sale regime
Since 6 December 2024 the threshold for buildings aged 50–59 is 70% ownership in the designated areas, or 80% outside them. The threshold drops further as the building ages.
Is it just this building, or the whole street?
Within 300 m there are 489 buildings on record, and 73 of them also carry an outstanding statutory order, average age 49 years.
Few buildings within 300 m carry an open order — this is not a neighbourhood-wide pattern.
Across Yau Tsim Mong district, 924 of 3273 buildings on record carry an open order.
So what do I actually do?
Everything above is fact. Below is judgement — what to ask before you sign given this exact combination, how the bill gets apportioned to you, and the full result of all 6 checks we ran, including the ones that came back clean.
- The specific questions to put to the seller and the owners' corporation before you sign
- How a major-repair levy is apportioned by share, and what level is normal right now
- All 6 checks in full — including the ones with nothing to report
- A report you can send to your partner, your solicitor or your bank
Payments are still in review. Leave your email — you will be first in when it opens, at the price shown above.
Verify it yourself
All of the above comes from Hong Kong government open data. Confirm through the official channels before you act on it.
Check another building
English or Chinese name, or the street. e.g. Mt Parker Lodge / Queen's Rd
What this page cannot tell you
- Records are per BUILDING, not per flat — an order does not mean the specific unit you are viewing has a problem.
- The unauthorised-works data covers removal orders served from 1 May 2023 onward only. No record ≠ no unauthorised works.
- Building age covers structures with a known occupation record, not every building in Hong Kong.
- This page is generated automatically from open data. It is not a building survey, and it is not legal or investment advice.